Hers Verifications
WE ARE DEDICATED TO HELPING YOU
Mandatory Hers Requirements
The Energy code requires the following mandatory HERS verifications for all Single family and Multifamily low-rise projects, which we can perform for you:
- Duct Leakage Verifications
- Verified Fan Wattage
- Adequate Airflow Verification
- Whole House Ventilation (Indoor Air Quality)
Performance Modeled HERS Testing
We can also perform any of the following performance modeled HERS verifications that may have been added to your Title 24 in order to comply. If these verifications appear on your T24, they must be performed before occupational permits will be issued. Here are some of the most popular HERS verifications:
- High Quality Insulation Inspections (QII)
- Ducts in conditioned space
- Verified Duct Surface Area
- Refrigerant Charge Verification
- EER & SEER Verification
- Surface Area Verification
- Low Leakage Air Handler